First Nations Land Flood Protection Projects
Owen Sound Stormwater Facility Design & Construction
Smart_IoT_Stormwater Grid Partnerships
Great Lakes Protection & Restoration Initiatives
Innisfil 6th Line Urbanization & Road Upgrade
Belle Aire Community Landscape Architecture
Simcoe County Flood Forecasting & Warning System
Lake Erie Community Infrastructure Systems Design
Blue Mountains Watermain Design & Construction
Indigenous People Environmental Collaborations
Ontario Watershed Planning Guidance Manual
Emergency Management Services Facility
Cobourg Creek Assimilative Capacity Study
Waterloo Stormwater Management Facility Retrofit
Penetanguishene Main Street Construction.
Sudbury Waterfront & Trail Plan
Development Review Services (South Georgian Bay Region)
Cobourg LiDAR Floodline Mapping Study
Assessment of Options for Round Goby Removal
Lefroy-Belle Ewart Community Municipal Servicing Plan
Carp River Restoration Plan - Third Party Review
Water Budget and Stress Assessment Modeling
Town of Walkerton Floodline Mapping
Riverside Development and Minnesota Street Sanitary Sewer Improvements
Collingwood Industrial Area Sanitary Servicing Project
Graham and Wilmot Creeks Subwatershed Studies
University of Guelph
The reappearance of excessive nutrient loading in Lake Erie and the subsequent algae blooms is an extremely complex issue and is quite different in nature than the previous phosphorous loadings in the 1970s. Unlike the issue in the 1970s, there are far more sources adding nutrients to the late and these sources are diverse in nature ranging from rural to urban. In order to understand the nutrient loading, both in the temporal and spatial domains, more complex analytic and predictive tools are required in order to help policy make sound, science based, and defendable solutions.
The University of Guelph is uniquely positioned to help address the issues around Lake Erie with long standing core strengths in both the agricultural sector and the environmental field. In conjunction with our partner, Greenland Consulting Engineers, and their watershed evaluation tool (CANWETTM), we believe that we have the engineering and technology to extrapolate CANWETTM from the watershed level up to the lake basin level and provide decision-making support for the entire Lake Erie basin.
Hussein Abdullah, Ph.D., P. Eng.
Director, School of Engineering
University of Guelph
January, 26 2015
Lake Simcoe Region Conservation Authority
RE: Town of Innisfil (Community of Alcona) Flood Reduction Class Environmental Assessment
On behalf of the Lake Simcoe Region Conservation Authority (LSRCA), I would like to thank GREENLAND® International - Consulting Engineers for the excellent work undertaken to complete the Flood Reduction Class Environmental Assessment for the Community of Alcona. I also want to provide you our sincere appreciation for the support GREENLAND® provided both in-kind and financially which allowed the project to proceed. The approved strategy will now enable the LSRCA and Town of Innisfil to move forward with the next phase of the project so that the science-based, publicly supported solution, can be implemented to alleviate flooding impacting residents in Alcona as soon as possible.
The project goal was to develop a sustainable - engineering solution to reduce significant annual flood damages currently occurring within the Community of Alcona (Town of Innisfil) and located within the Belle Aire Creek subwatershed. The project included a Class Environmental Assessment (EA) process with extensive public and other stakeholder consultations to advance a solution involving enhancing a wetland (green infrastructure) to provide flood mitigation. The project was proposed over a decade ago and was then adopted in the Town’s Master Drainage Plan as required under the Lake Simcoe Protection Plan. It is now one step closer to completion.
The project deliverables produced by GREENLAND® included an Environmental Study Report (ESR) which now provides a science-based, well-engineered, thorough and systematic understanding of the chronic flooding that has impacted the affected settlement area in the Town of Innisfil. The Environmental Study Report (by GREENLAND®) also developed a proactive flood mitigation and resiliency plan that can now be implemented by the LSRCA, Town and other stakeholders. Finally, the project work plan satisfied requirements of Ontario's Class Environmental Assessment process and with an effective/collaborative spirit of a "public-private partnership” utilizing and ecosystem approach. The timelines to complete the project were very aggressive and I was pleased that GREENLAND® was able to complete the project on-time and budget.
In conclusion, the role that GREENLAND® played to prepare the funding application for Canada’s National Disaster Mitigation Program; securing in-kind participation of the Intact Centre on Climate Adaptation (ICCA) at the University of Waterloo; providing in-kind Intellectual Property leveraging resources, and the financial contribution helped ensure the project was a complete success. I look forward to working with your company again on other partnerships of mutual interest and would be pleased to serve as professional references on similar projects.
Michael Walters
(Former) Chief Administrative Officer
Lake Simcoe Region Conservation Authority
November 6, 2020
City of Ottawa
On behalf of the City of Ottawa, we would like to thank Greenland International Consulting Limited, and in particular, Don Moss for his exemplary efforts in his role as Model Keeper for the City of Ottawa… Greenland has achieved a high level of confidence with Senior Staff and City Council as well Conservation authority and the Ontario Ministry of Environment… The City is appreciative of the new Modelling Tool developed by Greenland which will assist the City in conducting timely and efficient development reviews. The City will now be able to test proposed infrastructure with the overall development, determine changing impacts to existing infrastructure as ponds, as well as any changes to the receiving watercourses.
Don’s knowledge, dedication and professional approach over the past five years has been a crucial factor in the success of the project under very challenging circumstances.
Don Herweyer, MCIP, RPP
Program Manager
City of Ottawa
February 11, 2014