First Nations Land Flood Protection Projects
Owen Sound Stormwater Facility Design & Construction
Smart_IoT_Stormwater Grid Partnerships
Great Lakes Protection & Restoration Initiatives
Innisfil 6th Line Urbanization & Road Upgrade
Belle Aire Community Landscape Architecture
Simcoe County Flood Forecasting & Warning System
Lake Erie Community Infrastructure Systems Design
Blue Mountains Watermain Design & Construction
Indigenous People Environmental Collaborations
Ontario Watershed Planning Guidance Manual
Emergency Management Services Facility
Cobourg Creek Assimilative Capacity Study
Waterloo Stormwater Management Facility Retrofit
Penetanguishene Main Street Construction.
Sudbury Waterfront & Trail Plan
Development Review Services (South Georgian Bay Region)
Cobourg LiDAR Floodline Mapping Study
Assessment of Options for Round Goby Removal
Lefroy-Belle Ewart Community Municipal Servicing Plan
Carp River Restoration Plan - Third Party Review
Water Budget and Stress Assessment Modeling
Town of Walkerton Floodline Mapping
Riverside Development and Minnesota Street Sanitary Sewer Improvements
Collingwood Industrial Area Sanitary Servicing Project
Graham and Wilmot Creeks Subwatershed Studies
Canada's Oil Sands Innovation Alliance (COSIA)
Check out this (Greenland) video of THREATS (an open-source cumulative effects assessment tool to help direct environmental management (industrial or other)) and/or planning of future projects. It enables the compiling and juxtaposition of public environmental data (including, but not limited to, wildlife use areas and environmental quality data) with on-site or "targeted" environmental data. For security, the provision to include data protected behind a firewall exists to enable analysis and comparison of potentially sensitive data in the context of other datasets. The goal here is to allow for predictive capability and in turn mitigate potential effects. Equally, this provides a capacity to enable retroactive assessment (investigation of cause) of observed changes. The ability to spatially interpret stressor/pathway/receptor data, and conduct analyses within the tool, while retaining data in its original database (secure) is what is truly unique here. Excited to see what can be achieved with this powerful platform in areas where it has already begun to be used!
Neal Tanna
Advisor, Monitoring and Risk Assessment
Canada’s Oil Sands Innovation Alliance (COSIA)
November 3, 2017
Township of Adjala-Tosorontio
As Chief Administrative Officer for the Township of Adjala-Tosorontio, I would like to commend Greenland on their successful completion of the Everett Secondary Plan Master Servicing Plan and Class Environmental Assessment.
The level of service and timely delivery of all reports, analyses and correspondence was greatly appreciated by Township staff. Greenland’s innovative solutions and prompt responses to issues raised by the Town Staff Approvals Agencies and the affected public throughout the EA Process were very important, and we look forward to working with your team on future projects.
To that end, our team at the Township of Adjala-Tosorontio would be pleased to provide references for your firm on similar projects in future
Eric Wargel
Chief Administrative Officer
The Corporation of the Township of Adjala-Tosorontio
April 16, 2013
Town of Penetanguishene
As Director of Public Works for the Town of Penetanguishene, I would like to extend my appreciation to Greeland Consulting Engineers for providing exemplary contract administration and construction inspection services for the Penetang Main Street Reconstruction Project.
The Main Street reconstruction was a huge undertaking for the Town which consisted of: the full reconstruction of 1.4 km of roadway including widening for improved land widths, on-street parking, storm sewer replacement, watermain and sanitary sewer replacement, as well as landscaping and lighting improvements to better serve businesses and residents. The project included significant logistical challenges with respect to the coordination of public access for businesses, and providing workable upgrades to exisiting infrastructure under difficult site constraints and a tight time line.
As the Contract Administrator and on-site Construction inspector, Greenland always maintained open lines of communication between the Town, Contractor, affected businesses and residents, and promptly, responded to all questions and issues raised by the Contractor, the Town and the public. Greeland's attention to detail throughout the assignment helped ensure the project was completed on-time and under budget.
Bryan Murray, P. Eng
Director of Public Works
Town of Penetanguishene
February 12, 2019