First Nations Land Flood Protection Projects
Owen Sound Stormwater Facility Design & Construction
Smart_IoT_Stormwater Grid Partnerships
Great Lakes Protection & Restoration Initiatives
Innisfil 6th Line Urbanization & Road Upgrade
Belle Aire Community Landscape Architecture
Simcoe County Flood Forecasting & Warning System
Lake Erie Community Infrastructure Systems Design
Blue Mountains Watermain Design & Construction
Indigenous People Environmental Collaborations
Ontario Watershed Planning Guidance Manual
Emergency Management Services Facility
Cobourg Creek Assimilative Capacity Study
Waterloo Stormwater Management Facility Retrofit
Penetanguishene Main Street Construction.
Sudbury Waterfront & Trail Plan
Development Review Services (South Georgian Bay Region)
Cobourg LiDAR Floodline Mapping Study
Assessment of Options for Round Goby Removal
Lefroy-Belle Ewart Community Municipal Servicing Plan
Carp River Restoration Plan - Third Party Review
Water Budget and Stress Assessment Modeling
Town of Walkerton Floodline Mapping
Riverside Development and Minnesota Street Sanitary Sewer Improvements
Collingwood Industrial Area Sanitary Servicing Project
Graham and Wilmot Creeks Subwatershed Studies
Town of Penetanguishene
Thank you very much to everyone who was involved in making this happen. The report is very clear, precise, and informative. I’m pleasantly surprised at the (watermain testing) results which have eased some of my concerns regarding this pipe... Thanks again. Much appreciated.
Alain Roy
Water Distribution Operator
Town of Penetanguishene (Ontario)
December 9, 2024
Credit Valley Conservation
I wanted to take this opportunity to thank you for your work on the Brampton “Pond 10 Floating Islands Research Project”. This project was a “first of its kind” within our watershed.
Greenland was responsible for preparing the design brief for the islands that provided details on the anchoring system design, safety considerations and a strategy for establishing a vegetation community among other things. This was a challenging project given that there was no pre-established process to follow and therefore we were defining the design and implementation process from scratch.
Greenland was always very responsive when issues arose and helped us troubleshoot options to solve the issue. They refined the design brief and assisted CVC with implementing improved anchor designs that have been successful in keeping the islands stable over the past few years even though some extreme weather events.
We were very pleased with the consulting services Greenland provided for this project.
Phil James, P.Eng.
Manager, Watershed Protection and Restoration
Credit Valley Conservation
March 14, 2014
Agriculture and Agri-Food Canada
In March of 2013, Greenland International Consulting Ltd. completed a study for Agriculture and Agri-Food Canada to estimate nutrient loading in small catchment of about 177 square kilometers in the La Salle River watershed in southern Manitoba using the CANWET 4 model. Given uncertainties in some input data and model parameters, the preliminary results using the CANWET 4 model for baseline conditions of stream discharge, nutrient concentrations and loads were satisfactory in our project team as simulated values were within the range of observed values during the validation period.
This study suggests the CANWET 4 modeling approach could be used to predict changes to nutrient loads from changing land use scenarios in watersheds of this region.
Jason Vanrobaeys
Senior Land Resource Specialist
Agriculture and Agri-Food Canada