First Nations Land Flood Protection Projects
Owen Sound Stormwater Facility Design & Construction
Smart_IoT_Stormwater Grid Partnerships
Great Lakes Protection & Restoration Initiatives
Innisfil 6th Line Urbanization & Road Upgrade
Belle Aire Community Landscape Architecture
Simcoe County Flood Forecasting & Warning System
Lake Erie Community Infrastructure Systems Design
Blue Mountains Watermain Design & Construction
Indigenous People Environmental Collaborations
Ontario Watershed Planning Guidance Manual
Emergency Management Services Facility
Cobourg Creek Assimilative Capacity Study
Waterloo Stormwater Management Facility Retrofit
Penetanguishene Main Street Construction.
Sudbury Waterfront & Trail Plan
Development Review Services (South Georgian Bay Region)
Cobourg LiDAR Floodline Mapping Study
Assessment of Options for Round Goby Removal
Lefroy-Belle Ewart Community Municipal Servicing Plan
Carp River Restoration Plan - Third Party Review
Water Budget and Stress Assessment Modeling
Town of Walkerton Floodline Mapping
Riverside Development and Minnesota Street Sanitary Sewer Improvements
Collingwood Industrial Area Sanitary Servicing Project
Graham and Wilmot Creeks Subwatershed Studies
Town of Collingwood
RE: Town of Collingwood ‘Smart’ Stormwater Project
I would like to thank and recognize GREENLAND® for their leadership role in the above project. Your firm identified the opportunity to work together with other private firms and public sector organizations, together with the support of the Town of Collingwood and the Federation of Canadian Municipalities, to address a growing Concern in communities related to lot-level flood mitigation.
GREENLAND® strategized and implemented, over almost 3 years, the “first-ever in Canada” work plan to mitigate problems of climate-change induced stormwater flooding which impacts many residential, commercial and institutional properties. The innovative project approach monitored 4 different Low Impact Development (LID) approaches for reducing lot-level flooding and their ability to redirect site drainage away from municipal sewer systems. Using innovative real-time (aka ‘Smart’) technologies, GREENLAND® was also able to generate ‘Big Data’ that provided new insights into the effectiveness of these different approaches. The GREENLAND® team’s level of commitment, thoroughness and professionalism was appreciated by the municipality. GREENLAND® maintained open lines of communication with Town staff, contractors, participating residents, and promptly responded to all questions and issues raised by the public.
We commend your firm’s efforts as a pioneer in implementing this project approach.
Sonya Skinner
Acting Chief Administrative Officer
Town of Collingwood
June 2, 2020
University of Guelph
The reappearance of excessive nutrient loading in Lake Erie and the subsequent algae blooms is an extremely complex issue and is quite different in nature than the previous phosphorous loadings in the 1970s. Unlike the issue in the 1970s, there are far more sources adding nutrients to the late and these sources are diverse in nature ranging from rural to urban. In order to understand the nutrient loading, both in the temporal and spatial domains, more complex analytic and predictive tools are required in order to help policy make sound, science based, and defendable solutions.
The University of Guelph is uniquely positioned to help address the issues around Lake Erie with long standing core strengths in both the agricultural sector and the environmental field. In conjunction with our partner, Greenland Consulting Engineers, and their watershed evaluation tool (CANWETTM), we believe that we have the engineering and technology to extrapolate CANWETTM from the watershed level up to the lake basin level and provide decision-making support for the entire Lake Erie basin.
Hussein Abdullah, Ph.D., P. Eng.
Director, School of Engineering
University of Guelph
January, 26 2015
Urbantech® Consulting
Hi Mark,
Thanks for the note. Both files went very well, both approved at LPAT and we are in detail design now. The input from the Greenland team was greatly appreciated and ensured the hydraulic analysis was accurate. Conservation Halton signed off on the hazard mapping ahead of both LPAT hearings which was huge!
J. David Leighton, C.E.T.
President
Urbantech® Consulting (Markham, Canada)
November 29, 2024