Water Resources

The major connecting link in a watershed or river basin ecosystem is the flow of water. The flow pattern is part of the water balance. How and where the water flows determines the quality of the water, the shape and stability of stream banks, the health and diversity of the vegetation, and the availability of fish and wildlife habitat.

Since incorporation (in 1994), the GREENLAND® approach to water resources projects is to ensure that the operational balance of surface water, groundwater and/or coastal water systems are maintained and that interventions are made with a perspective of the entire ecosystem. Our recognized credentials include these water resources and related environmental engineering analytical, design and construction administration services:

  • Subwatershed Management Plans;
  • Drinking Water Source Protection Plans;
  • Groundwater Management Plans;
  • Environmental Assessments;
  • Environmental Impact Statements;
  • Water Quality and Assimilative Capacity Analyses;
  • Municipal Infrastructure and Site Remediation Investigations;
  • Environmental Restoration and Resource Management Plans;
  • Stormwater Management Plans;
  • Municipal Drain Projects;
  • Sediment Control Plans;
  • Stormwater Drainage and Pond Retrofits;
  • Master Drainage Plans;
  • Master Servicing and Functional Servicing Plans;
  • Stream Rehabilitation / Remediation Plans;
  • Flood Risk Mapping, Flood Remediation Plans & Flood Control Designs;
  • Coastal Engineering and Shoreline Protection;
  • River Ice Engineering Control Works;
  • Stream Health (Biological / Water Chemistry / Flow) & Groundwater Monitoring;
  • Water Balance and Hydrogeologic Investigations;
  • Fish Passage Designs and Habitat Rehabilitation;
  • Hydropower Systems;
  • Municipal Official / Secondary Plan Reviews; and,
  • Expert Testimony.

Social Media

 
LinkedIn 
YouTube

Client Testimonials

Bird Construction Ltd.

Dear Team,

I wanted to extend my heartfelt thanks to each of you for your invaluable contributions to the 29 Birch Street RFP. Your dedication, insights, and collaborative spirit have been instrumental in shaping a comprehensive and compelling proposal. It’s amazing how well this team has come together and worked online, and this RFP document and team will form a repeatable and formidable approach as we see more RFPs hit the province.

On behalf of BIRD, thank you once again for your commitment and exceptional work. I look forward to our continued success together.

Sean Hart
Construction Manager
Bird Construction Ltd.

January 9, 2024
 

Lake Simcoe Region Conservation Authority

RE: Town of Innisfil (Community of Alcona) Flood Reduction Class Environmental Assessment

On behalf of the Lake Simcoe Region Conservation Authority (LSRCA), I would like to thank GREENLAND® International - Consulting Engineers for the excellent work undertaken to complete the Flood Reduction Class Environmental Assessment for the Community of Alcona. I also want to provide you our sincere appreciation for the support GREENLAND® provided both in-kind and financially which allowed the project to proceed. The approved strategy will now enable the LSRCA and Town of Innisfil to move forward with the next phase of the project so that the science-based, publicly supported solution, can be implemented to alleviate flooding impacting residents in Alcona as soon as possible. 

The project goal was to develop a sustainable - engineering solution to reduce significant annual flood damages currently occurring within the Community of Alcona (Town of Innisfil) and located within the Belle Aire Creek subwatershed. The project included a Class Environmental Assessment (EA) process with extensive public and other stakeholder consultations to advance a solution involving enhancing a wetland (green infrastructure) to provide flood mitigation. The project was proposed over a decade ago and was then adopted in the Town’s Master Drainage Plan as required under the Lake Simcoe Protection Plan. It is now one step closer to completion. 

The project deliverables produced by GREENLAND® included an Environmental Study Report (ESR) which now provides a science-based, well-engineered, thorough and systematic understanding of the chronic flooding that has impacted the affected settlement area in the Town of Innisfil. The Environmental Study Report (by GREENLAND®) also developed a proactive flood mitigation and resiliency plan that can now be implemented by the LSRCA, Town and other stakeholders. Finally, the project work plan satisfied requirements of Ontario's Class Environmental Assessment process and with an effective/collaborative spirit of a "public-private partnership” utilizing and ecosystem approach. The timelines to complete the project were very aggressive and I was pleased that GREENLAND® was able to complete the project on-time and budget. 

In conclusion, the role that GREENLAND® played to prepare the funding application for Canada’s National Disaster Mitigation Program; securing in-kind participation of the Intact Centre on Climate Adaptation (ICCA) at the University of Waterloo; providing in-kind Intellectual Property leveraging resources, and the financial contribution helped ensure the project was a complete success. I look forward to working with your company again on other partnerships of mutual interest and would be pleased to serve as professional references on similar projects. 

Michael Walters
(Former) Chief Administrative Officer
Lake Simcoe Region Conservation Authority

November 6, 2020
 

Cortel Group

Greenland and Dr. Goss also played an important role in identifying issues with the initial study proposal.

This led to the Province and Williams Treaty First Nations reaching a resolution based on manageable terms.

With thanks,

Elsa Fancello
Project Manager
Cortel Group (Vaughan, Canada)
November 20, 2024
 

Corporate Partnerships & Associations

Partnerships and Accreditations