Water Resources

The major connecting link in a watershed or river basin ecosystem is the flow of water. The flow pattern is part of the water balance. How and where the water flows determines the quality of the water, the shape and stability of stream banks, the health and diversity of the vegetation, and the availability of fish and wildlife habitat.

Since incorporation (in 1994), the GREENLAND® approach to water resources projects is to ensure that the operational balance of surface water, groundwater and/or coastal water systems are maintained and that interventions are made with a perspective of the entire ecosystem. Our recognized credentials include these water resources and related environmental engineering analytical, design and construction administration services:

  • Subwatershed Management Plans;
  • Drinking Water Source Protection Plans;
  • Groundwater Management Plans;
  • Environmental Assessments;
  • Environmental Impact Statements;
  • Water Quality and Assimilative Capacity Analyses;
  • Municipal Infrastructure and Site Remediation Investigations;
  • Environmental Restoration and Resource Management Plans;
  • Stormwater Management Plans;
  • Municipal Drain Projects;
  • Sediment Control Plans;
  • Stormwater Drainage and Pond Retrofits;
  • Master Drainage Plans;
  • Master Servicing and Functional Servicing Plans;
  • Stream Rehabilitation / Remediation Plans;
  • Flood Risk Mapping, Flood Remediation Plans & Flood Control Designs;
  • Coastal Engineering and Shoreline Protection;
  • River Ice Engineering Control Works;
  • Stream Health (Biological / Water Chemistry / Flow) & Groundwater Monitoring;
  • Water Balance and Hydrogeologic Investigations;
  • Fish Passage Designs and Habitat Rehabilitation;
  • Hydropower Systems;
  • Municipal Official / Secondary Plan Reviews; and,
  • Expert Testimony.

Social Media

 
LinkedIn 
YouTube

Client Testimonials

Town of Innisfil

I would like to congratulate Greenland Consulting Engineers on winning the 2012 Consulting Engineers of Ontario Environment Award of Excellence. The award recognizes your work on the Nottawasaga Pines Secondary School construction project with the Simcoe Country District School Board. This is a well deserved honour and is a reflection of both the caliber of your work and your team.

I continue to be impressed with your company’s commitment and innovation in the field of sustainable development. You have set an excellent example for others throughout Simcoe County  and the Province of Ontario.

John Skorobohacz
(Former) Chief Administrative Officer
The Corporation of the Town of Innisfil

May 1, 2012
 

The City of Waterloo

As a Senior Project Engineer (Water Resources) for the City of Waterloo, I would like to extend my appreciation to Greenland Consulting Engineers for providing exemplary EA planning, design, contract administration and construction inspection services for the Pond #53 Sediment Removal/Reuse and Retrofit Project.
 
This project was an important undertaking for the City which consisted of: the removal of 360m3 of sediment for reuse in a City owned boulevard area; removal of all additional sediment (approx. 3,000m3) from the SWMF permanent pool and forebay area to improve its operation, implementation of the retrofit design including improved maintenance access and proactive management of many unforeseen conditions throughout the duration of the project. This project also included significant logistical challenges with respect to the coordination of public access for area residents and businesses, and providing workable solutions to implementing the design as intended due to challenging unforseen site constraints.

As the Design Consultant, Contract Administrator and on-site Construction Inspector, Greenland always maintained open lines of communication between the City, Contractor and the affected residents, and promptly responded to all questions and issues raised by the Contractor, the City and the public. Greenland’s attention to detail throughout the entire duration of this assignment helped ensure the project was completed as required.

Jessica Kellerman, P. Eng
Senior Project Engineer - Water Resources
Engineering Services, Design & Construction
City of Waterloo

October 24, 2019
 

Corporation of the Town of Collingwood (Canada)

On behalf of Council and the residents of Collingwood, I want to thank you for generously giving your time, expertise and experience to our community to assist Town staff in addressing the water capacity issues at the Raymond A. Barker Water Treatment Plant (WTP).

Since becoming aware of the capacity issues this spring and then implementing an Interim Control By-Law, this issue has been the top priority of Council. Your input and contribution on proactive measures to mitigate the summer/winter capacity differential and to increase the WTP capacity pending the completion of the expansion have been of great benefit to Council and to staff. As a result of your input, Council directed staff to include the option of UV Disinfection retrofit to the existing WTP as part of the expansion design RFP process and we are optimistic this will be done.

Thank you for your personal and professional commitment to our community, it is impactful and very much appreciated by myself and my Council colleagues.

Yours very truly,

Bruan Saunderson 
Mayor 
Corporation of the Town of Collingwood (Canada)

July 7, 2021
 

Corporate Partnerships & Associations

Partnerships and Accreditations