Disclaimer

Legal Notice About This Website

All content on this site is owned or controlled by Greenland International Consulting Ltd., and is protected by worldwide copyright laws. You may download content only for your personal use for non-commercial purposes, but no modification or further reproduction of the content is permitted. The content may not be copied or used in any way. Greenland International Consulting Ltd., will use reasonable efforts to include up-to-date and accurate information in this Internet site, but makes no representations, warranties, or assurances as to the accuracy, currency or completeness of the information provided. Greenland International Consulting Ltd., shall not be liable for any damages or injury resulting from your access to, or inability to access, this Internet site, or from your reliance on any information provided at this Internet site. Please note that the documents and information available on this site are provided as a service only and are not official versions of Greenland documents. In addition, site contents may not always be the most current source for company information. Internet software or transmission problems could produce inaccurate or incomplete copies of various documents when downloaded and displayed on a user's computer.

The information and documents available on this site are not intended to provide specific legal, accounting, investment/financial or tax advice to any user. This site may provide links or references to other internet sites. Greenland International Consulting Ltd., makes no representations, warranties or assurances as to any information in such sites and has no responsibility for their content, accuracy, currency or completeness and shall not be liable for any damages or injury arising from that content, accuracy, currency or completeness. Any links to other sites are provided merely as a convenience to the users of this Internet site. The trademarks, services marks, trade names, trade dress and products represented on this Internet site are protected in Canada and internationally. No use of these may be made without prior, written authorization of Greenland International Consulting Ltd. except to identify the products or services of the company. The sender of communications to this Internet site or otherwise to Greenland International Consulting Ltd., shall be responsible for the content and information contained therein, including its truthfulness and accuracy. This Internet site is provided as a service to its visitors. Greenland International Consulting Ltd., reserves the right to delete, modify or supplement the content of this site at any time for any reason without notification to anyone.

Social Media

 
LinkedIn 
YouTube

Client Testimonials

Lake Simcoe Region Conservation Authority

RE: Town of Innisfil (Community of Alcona) Flood Reduction Class Environmental Assessment

On behalf of the Lake Simcoe Region Conservation Authority (LSRCA), I would like to thank GREENLAND® International - Consulting Engineers for the excellent work undertaken to complete the Flood Reduction Class Environmental Assessment for the Community of Alcona. I also want to provide you our sincere appreciation for the support GREENLAND® provided both in-kind and financially which allowed the project to proceed. The approved strategy will now enable the LSRCA and Town of Innisfil to move forward with the next phase of the project so that the science-based, publicly supported solution, can be implemented to alleviate flooding impacting residents in Alcona as soon as possible. 

The project goal was to develop a sustainable - engineering solution to reduce significant annual flood damages currently occurring within the Community of Alcona (Town of Innisfil) and located within the Belle Aire Creek subwatershed. The project included a Class Environmental Assessment (EA) process with extensive public and other stakeholder consultations to advance a solution involving enhancing a wetland (green infrastructure) to provide flood mitigation. The project was proposed over a decade ago and was then adopted in the Town’s Master Drainage Plan as required under the Lake Simcoe Protection Plan. It is now one step closer to completion. 

The project deliverables produced by GREENLAND® included an Environmental Study Report (ESR) which now provides a science-based, well-engineered, thorough and systematic understanding of the chronic flooding that has impacted the affected settlement area in the Town of Innisfil. The Environmental Study Report (by GREENLAND®) also developed a proactive flood mitigation and resiliency plan that can now be implemented by the LSRCA, Town and other stakeholders. Finally, the project work plan satisfied requirements of Ontario's Class Environmental Assessment process and with an effective/collaborative spirit of a "public-private partnership” utilizing and ecosystem approach. The timelines to complete the project were very aggressive and I was pleased that GREENLAND® was able to complete the project on-time and budget. 

In conclusion, the role that GREENLAND® played to prepare the funding application for Canada’s National Disaster Mitigation Program; securing in-kind participation of the Intact Centre on Climate Adaptation (ICCA) at the University of Waterloo; providing in-kind Intellectual Property leveraging resources, and the financial contribution helped ensure the project was a complete success. I look forward to working with your company again on other partnerships of mutual interest and would be pleased to serve as professional references on similar projects. 

Michael Walters
(Former) Chief Administrative Officer
Lake Simcoe Region Conservation Authority

November 6, 2020
 

Cortel Group

Greenland and Dr. Goss played an important role in identifying issues with the initial study proposal.

This led to the Province and Williams Treaty First Nations reaching a resolution based on manageable terms.

With thanks,

Elsa Fancello
Project Manager
Cortel Group (Vaughan, Canada)
November 20, 2024

Town of Penetanguishene

As Director of Public Works for the Town of Penetanguishene, I would like to extend my appreciation to Greeland Consulting Engineers for providing exemplary contract administration and construction inspection services for the Penetang Main Street Reconstruction Project. 

The Main Street reconstruction was a huge undertaking for the Town which consisted of: the full reconstruction of 1.4 km of roadway including widening for improved land widths, on-street parking, storm sewer replacement, watermain and sanitary sewer replacement, as well as landscaping and lighting improvements to better serve businesses and residents. The project included significant logistical challenges with respect to the coordination of public access for businesses, and providing workable upgrades to exisiting infrastructure under difficult site constraints and a tight time line. 

As the Contract Administrator and on-site Construction inspector, Greenland always maintained open lines of communication between the Town, Contractor, affected businesses and residents, and promptly, responded to all questions and issues raised by the Contractor, the Town and the public. Greenland's attention to detail throughout the assignment helped ensure the project was completed on-time and under budget. 

Bryan Murray, P. Eng
Director of Public Works
Town of Penetanguishene

February 12, 2019
 

Corporate Partnerships & Associations

Partnerships and Accreditations