Client Testimonials

Credit Valley Conservation

I wanted to take this opportunity to thank you for your work on the Brampton “Pond 10 Floating Islands Research Project”. This project was a “first of its kind” within our watershed.

Greenland was responsible for preparing the design brief for the islands that provided details on the anchoring system design, safety considerations and a strategy for establishing a vegetation community among other things. This was a challenging project given that there was no pre-established process to follow and therefore we were defining the design and implementation process from scratch.

Greenland was always very responsive when issues arose and helped us troubleshoot options to solve the issue. They refined the design brief and assisted CVC with implementing improved anchor designs that have been successful in keeping the islands stable over the past few years even though some extreme weather events.

We were very pleased with the consulting services Greenland provided for this project.

Phil James, P.Eng.
Manager, Watershed Protection and Restoration
Credit Valley Conservation

March 14, 2014
 

Lake Simcoe Region Conservation Authority

RE: Town of Innisfil (Community of Alcona) Flood Reduction Class Environmental Assessment

On behalf of the Lake Simcoe Region Conservation Authority (LSRCA), I would like to thank GREENLAND® International - Consulting Engineers for the excellent work undertaken to complete the Flood Reduction Class Environmental Assessment for the Community of Alcona. I also want to provide you our sincere appreciation for the support GREENLAND® provided both in-kind and financially which allowed the project to proceed. The approved strategy will now enable the LSRCA and Town of Innisfil to move forward with the next phase of the project so that the science-based, publicly supported solution, can be implemented to alleviate flooding impacting residents in Alcona as soon as possible. 

The project goal was to develop a sustainable - engineering solution to reduce significant annual flood damages currently occurring within the Community of Alcona (Town of Innisfil) and located within the Belle Aire Creek subwatershed. The project included a Class Environmental Assessment (EA) process with extensive public and other stakeholder consultations to advance a solution involving enhancing a wetland (green infrastructure) to provide flood mitigation. The project was proposed over a decade ago and was then adopted in the Town’s Master Drainage Plan as required under the Lake Simcoe Protection Plan. It is now one step closer to completion. 

The project deliverables produced by GREENLAND® included an Environmental Study Report (ESR) which now provides a science-based, well-engineered, thorough and systematic understanding of the chronic flooding that has impacted the affected settlement area in the Town of Innisfil. The Environmental Study Report (by GREENLAND®) also developed a proactive flood mitigation and resiliency plan that can now be implemented by the LSRCA, Town and other stakeholders. Finally, the project work plan satisfied requirements of Ontario's Class Environmental Assessment process and with an effective/collaborative spirit of a "public-private partnership” utilizing and ecosystem approach. The timelines to complete the project were very aggressive and I was pleased that GREENLAND® was able to complete the project on-time and budget. 

In conclusion, the role that GREENLAND® played to prepare the funding application for Canada’s National Disaster Mitigation Program; securing in-kind participation of the Intact Centre on Climate Adaptation (ICCA) at the University of Waterloo; providing in-kind Intellectual Property leveraging resources, and the financial contribution helped ensure the project was a complete success. I look forward to working with your company again on other partnerships of mutual interest and would be pleased to serve as professional references on similar projects. 

Michael Walters
(Former) Chief Administrative Officer
Lake Simcoe Region Conservation Authority

November 6, 2020
 

The City of Waterloo

As a Senior Project Engineer (Water Resources) for the City of Waterloo, I would like to extend my appreciation to Greenland Consulting Engineers for providing exemplary EA planning, design, contract administration and construction inspection services for the Pond #53 Sediment Removal/Reuse and Retrofit Project.
 
This project was an important undertaking for the City which consisted of: the removal of 360m3 of sediment for reuse in a City owned boulevard area; removal of all additional sediment (approx. 3,000m3) from the SWMF permanent pool and forebay area to improve its operation, implementation of the retrofit design including improved maintenance access and proactive management of many unforeseen conditions throughout the duration of the project. This project also included significant logistical challenges with respect to the coordination of public access for area residents and businesses, and providing workable solutions to implementing the design as intended due to challenging unforseen site constraints.

As the Design Consultant, Contract Administrator and on-site Construction Inspector, Greenland always maintained open lines of communication between the City, Contractor and the affected residents, and promptly responded to all questions and issues raised by the Contractor, the City and the public. Greenland’s attention to detail throughout the entire duration of this assignment helped ensure the project was completed as required.

Jessica Kellerman, P. Eng
Senior Project Engineer - Water Resources
Engineering Services, Design & Construction
City of Waterloo

October 24, 2019
 

Corporate Partnerships & Associations

Partnerships and Accreditations