RE: Town of Innisfil (Community of Alcona) Flood Reduction Class Environmental Assessment

On behalf of the Lake Simcoe Region Conservation Authority (LSRCA), I would like to thank GREENLAND® International - Consulting Engineers for the excellent work undertaken to complete the Flood Reduction Class Environmental Assessment for the Community of Alcona. I also want to provide you our sincere appreciation for the support GREENLAND® provided both in-kind and financially which allowed the project to proceed. The approved strategy will now enable the LSRCA and Town of Innisfil to move forward with the next phase of the project so that the science-based, publicly supported solution, can be implemented to alleviate flooding impacting residents in Alcona as soon as possible. 

The project goal was to develop a sustainable - engineering solution to reduce significant annual flood damages currently occurring within the Community of Alcona (Town of Innisfil) and located within the Belle Aire Creek subwatershed. The project included a Class Environmental Assessment (EA) process with extensive public and other stakeholder consultations to advance a solution involving enhancing a wetland (green infrastructure) to provide flood mitigation. The project was proposed over a decade ago and was then adopted in the Town’s Master Drainage Plan as required under the Lake Simcoe Protection Plan. It is now one step closer to completion. 

The project deliverables produced by GREENLAND® included an Environmental Study Report (ESR) which now provides a science-based, well-engineered, thorough and systematic understanding of the chronic flooding that has impacted the affected settlement area in the Town of Innisfil. The Environmental Study Report (by GREENLAND®) also developed a proactive flood mitigation and resiliency plan that can now be implemented by the LSRCA, Town and other stakeholders. Finally, the project work plan satisfied requirements of Ontario's Class Environmental Assessment process and with an effective/collaborative spirit of a "public-private partnership” utilizing and ecosystem approach. The timelines to complete the project were very aggressive and I was pleased that GREENLAND® was able to complete the project on-time and budget. 

In conclusion, the role that GREENLAND® played to prepare the funding application for Canada’s National Disaster Mitigation Program; securing in-kind participation of the Intact Centre on Climate Adaptation (ICCA) at the University of Waterloo; providing in-kind Intellectual Property leveraging resources, and the financial contribution helped ensure the project was a complete success. I look forward to working with your company again on other partnerships of mutual interest and would be pleased to serve as professional references on similar projects. 

Michael Walters
(Former) Chief Administrative Officer
Lake Simcoe Region Conservation Authority

November 6, 2020
 

Township of Essa

RE: Township of Essa Engineering Services
 
On behalf of the Township of Essa (Township), I would like to acknowledge Greenland for its exemplary services to complete the 2022 Community of Angus Infrastructure Master Plan (IMP) Class Environmental Assessment (EA). This legacy Township document developed municipal water and wastewater system models. These calibrated tools were then used by Greenland to develop a sustainable infrastructure planning framework for water and wastewater servicing expansion requirements within the Community of Angus. The project was completed “on-budget and on-time” and cognizant of environmental, technical and socio-economic constraints and opportunities affecting the Township of Essa.

We also appreciate your team’s expertise to provide subsequent model-keeper and development peer review support services. These important responsibilities and overseen by Township staff will help ensure new development approvals proceed in a manner which is consistent with the infrastructure management and expansion needs established by the completed IMP EA project.

Finally, we recognize the professional credentials and attention to detail involvement by your assigned team led by Mr. Josh Maitland, P. Eng.

We look forward to working with Greenland on other projects and serving as a professional reference.
 
Michael Mikael, P.Eng
Manager of Public Works/Deputy CAO
Township of Essa
October 18, 2023
 

Town of Collingwood

On behalf of the Town of Collingwood, I would like to thank the Greenland Group of Companies for their design and execution of the Town’s vision for Heritage Park, coordination of all consultants, contract administration and construction inspection.

Greenland always strives for thoroughness, professionalism and addressing their clients needs on each of their projects – this was no exception.

Peter G. Dunbar
Director, Leisure Services
Town of Collingwood

August 30, 2010
 