Active & Completed Projects:
Bolton Camp Architectural and Engineering Services
Public Storage Facility - Scarborough, ON
Region of Durham Material Recovery Facility
Portage Place - Peterborough, ON
Di Domizio Residential Development
Township of Essa
RE: Township of Essa Engineering Services
On behalf of the Township of Essa (Township), I would like to acknowledge Greenland for its exemplary services to complete the 2022 Community of Angus Infrastructure Master Plan (IMP) Class Environmental Assessment (EA). This legacy Township document developed municipal water and wastewater system models. These calibrated tools were then used by Greenland to develop a sustainable infrastructure planning framework for water and wastewater servicing expansion requirements within the Community of Angus. The project was completed “on-budget and on-time” and cognizant of environmental, technical and socio-economic constraints and opportunities affecting the Township of Essa.
We also appreciate your team’s expertise to provide subsequent model-keeper and development peer review support services. These important responsibilities and overseen by Township staff will help ensure new development approvals proceed in a manner which is consistent with the infrastructure management and expansion needs established by the completed IMP EA project.
Finally, we recognize the professional credentials and attention to detail involvement by your assigned team led by Mr. Josh Maitland, P. Eng.
We look forward to working with Greenland on other projects and serving as a professional reference.
Michael Mikael, P.Eng
Manager of Public Works/Deputy CAO
Township of Essa
October 18, 2023
Sustainable Buildings Canada
Sustainable Buildings Canada (SBC) has worked closely with Greenland Consulting Engineers (Greenland) as part of the Savings By Design program offered by Enbridge Gas Distribution. The program features an integrated design workshop that exposes builders and developers to the potential environmental and energy performance benefits that can be achieved through a holistic planning process. This includes identifying alternative approaches to site sustainability including low impact development and storm water management.
Inherent in the integrated design process is the need to access experienced and highly qualified individuals and organizations that can identify potential alternative solutions. SBC has a very capable roster of consultants that represent the core expertise required for this kind of expertise. Greenland is one of those organizations, providing critical input related to storm water management, low impact development and site sustainability.
Greenland consulting staff are all extremely knowledgeable and up to date on the various issues related to storm water management and low impact development and have always provided that expertise in a professional manner, recognizing the need to be sensitive to both the needs of the developers and the desire to improve environmental performance. It has been a great pleasure to work with Greenland and we look forward to doing so in the future.
Michael Singleton
Executive Director
Sustainable Buildings Canada
November 1, 2013
Credit Valley Conservation
I wanted to take this opportunity to thank you for your work on the Brampton “Pond 10 Floating Islands Research Project”. This project was a “first of its kind” within our watershed.
Greenland was responsible for preparing the design brief for the islands that provided details on the anchoring system design, safety considerations and a strategy for establishing a vegetation community among other things. This was a challenging project given that there was no pre-established process to follow and therefore we were defining the design and implementation process from scratch.
Greenland was always very responsive when issues arose and helped us troubleshoot options to solve the issue. They refined the design brief and assisted CVC with implementing improved anchor designs that have been successful in keeping the islands stable over the past few years even though some extreme weather events.
We were very pleased with the consulting services Greenland provided for this project.
Phil James, P.Eng.
Manager, Watershed Protection and Restoration
Credit Valley Conservation
March 14, 2014