Innisfil (Mobility) Orbit & Related Municipal Infrastructure Projects
Engineer-of-Record & Development Peer Reviewer (Township of Adjala-Tosorontio)
Angus Infrastructure Master Plan (Incl. Other Settlements)
Town of Collingwood - Stormwater Master Plan: Phases ‘1’ and ‘2’
Township of Georgian Bay Water Quality Monitoring Program / Platform (2025)
Web-Based Source Water Protection Assessment Tool (Drinking Water Protection)
Web-Based Source Water Protection Assessment Tool (Municipality Water Supply Treatment)
Owen Sound Stormwater Facility Design & Construction
First Nations Land Flood Protection Projects
Smart_IoT_Stormwater Grid Partnerships
Great Lakes Protection & Restoration Initiatives
Innisfil 6th Line Urbanization & Road Upgrade
Belle Aire Community Landscape Architecture
Simcoe County Flood Forecasting & Warning System
Lake Erie Community Infrastructure Systems Design
Blue Mountains Watermain Design & Construction
Indigenous People Environmental Collaborations
Ontario Watershed Planning Guidance Manual
Emergency Management Services Facility
Cobourg Creek Assimilative Capacity Study
Waterloo Stormwater Management Facility Retrofit
Penetanguishene Main Street Construction.
Sudbury Waterfront & Trail Plan
Development Review Services (South Georgian Bay Region)
Cobourg LiDAR Floodline Mapping Study
Assessment of Options for Round Goby Removal
Lefroy-Belle Ewart Community Municipal Servicing Plan
Carp River Restoration Plan - Third Party Review
Water Budget and Stress Assessment Modeling
Town of Walkerton Floodline Mapping
Riverside Development and Minnesota Street Sanitary Sewer Improvements
Collingwood Industrial Area Sanitary Servicing Project
Graham and Wilmot Creeks Subwatershed Studies
Six Nations Council
On behalf of the Environment Office of the Six Nations of the Grand River, we would like to thank Greenland International Consulting Limited for the work completed to prepare the Master Drainage and Flood Remediation Plan (MDFRP) for the McKenzie Creek watershed. This plan has now enabled our office to identify the flood prone residences throughout the watershed with the flood plain mapping that has been prepared as part of this assignement. We appreciate the role that Greenland has played in assisting our office in directing Public Works with prioritizing the remedial projects to be completed in the flood prone areas.
We also appreciate Greenland's effort in assisting the Six Nations of the Grand River with the preparation of funding applications to secure the resources to complete these remedial works. We are convinced that this MDFRP can be used as a template for completing similar drainage and flood remediation works both locally and in other First Nations lands.
We look forward to working with your company again in the near future on the remaining watersheds that need this important work done.
Thank you for your ongoing assistance.
Clynt King
Environmental Technician
Six Nations Council Environment Office
July 25, 2016
Township of Essa
RE: Township of Essa Engineering Services
On behalf of the Township of Essa (Township), I would like to acknowledge Greenland for its exemplary services to complete the 2022 Community of Angus Infrastructure Master Plan (IMP) Class Environmental Assessment (EA). This legacy Township document developed municipal water and wastewater system models. These calibrated tools were then used by Greenland to develop a sustainable infrastructure planning framework for water and wastewater servicing expansion requirements within the Community of Angus. The project was completed “on-budget and on-time” and cognizant of environmental, technical and socio-economic constraints and opportunities affecting the Township of Essa.
We also appreciate your team’s expertise to provide subsequent model-keeper and development peer review support services. These important responsibilities and overseen by Township staff will help ensure new development approvals proceed in a manner which is consistent with the infrastructure management and expansion needs established by the completed IMP EA project.
Finally, we recognize the professional credentials and attention to detail involvement by your assigned team led by Mr. Josh Maitland, P. Eng.
We look forward to working with Greenland on other projects and serving as a professional reference.
Michael Mikael, P.Eng
Manager of Public Works/Deputy CAO
Township of Essa
October 18, 2023
Intact Centre on Climate Adaptation
The Intact Centre on Climate Adaptation (ICCA) is a national applied research centre that focuses on mobilizing practical and cost-effective solutions to address climate change and extreme weather events. To this end, the ICCA is an incubator of new adaptation ideas, conducting research, knowledge mobilization and promoting initiatives aimed at de-risking the negative impacts of a changing climate and extreme weather. One of ICCA’s concerns is a growing uninsurable housing market in Canada relative to sewer backup.
ICCA believes the advanced technology and features of the SafeSump system can be instrumental to mitigating basement flood potential. I have one of the first prototypes of the SafeSump system installed in my home. I have interacted directly with the start-up founder. I view him as entrepreneurial and passionate, and have met other members of his team with whom I was similarly impressed. I am also familiar with Greenland Consulting Engineers, and congratulate SafeSump Inc. on their choice to create a joint “SafeSump” venture with Greenland.
ICCA looks forward to a supportive relationship with SafeSump Inc. upon the larger scale availability of their much-needed technology.
Dr. Blair Feltmate
Head, Intact Centre on Climate Adaptation
Faculty of Environment
University of Waterloo
October 6, 2016