Client Testimonials

University of Guelph

The reappearance of excessive nutrient loading in Lake Erie and the subsequent algae blooms is an extremely complex issue and is quite different in nature than the previous phosphorous loadings in the 1970s. Unlike the issue in the 1970s, there are far more sources adding nutrients to the late and these sources are diverse in nature ranging from rural to urban. In order to understand the nutrient loading, both in the temporal and spatial domains, more complex analytic and predictive tools are required in order to help policy make sound, science based, and defendable solutions.

The University of Guelph is uniquely positioned to help address the issues around Lake Erie with long standing core strengths in both the agricultural sector and the environmental field. In conjunction with our partner, Greenland Consulting Engineers, and their watershed evaluation tool (CANWETTM), we believe that we have the engineering and technology to extrapolate CANWETTM from the watershed level up to the lake basin level and provide decision-making support for the entire Lake Erie basin.

Hussein Abdullah, Ph.D., P. Eng.
Director, School of Engineering
University of Guelph

January, 26 2015
 

Corporation of the Town of Collingwood (Canada)

RE: Town of Collingwood - Master Stormwater Management Final Report

Your team did a great job conveying the output of your work to the Development Committee last night.  I think the analysis was well understood by Members, and that there is confidence in the approach you have taken to the work.  This topic is very important for Collingwood, and it is great to have this intelligent analysis from which to continue to leap forward.
 
Sincerely,
 
Sonya G. Skinner, P. Eng.
Chief Administrative Officer
Corporation of the Town of Collingwood (Canada)
February 15, 2022
 

Town of Penetanguishene

As Director of Public Works for the Town of Penetanguishene, I would like to extend my appreciation to Greeland Consulting Engineers for providing exemplary contract administration and construction inspection services for the Penetang Main Street Reconstruction Project. 

The Main Street reconstruction was a huge undertaking for the Town which consisted of: the full reconstruction of 1.4 km of roadway including widening for improved land widths, on-street parking, storm sewer replacement, watermain and sanitary sewer replacement, as well as landscaping and lighting improvements to better serve businesses and residents. The project included significant logistical challenges with respect to the coordination of public access for businesses, and providing workable upgrades to exisiting infrastructure under difficult site constraints and a tight time line. 

As the Contract Administrator and on-site Construction inspector, Greenland always maintained open lines of communication between the Town, Contractor, affected businesses and residents, and promptly, responded to all questions and issues raised by the Contractor, the Town and the public. Greeland's attention to detail throughout the assignment helped ensure the project was completed on-time and under budget. 

Bryan Murray, P. Eng
Director of Public Works
Town of Penetanguishene