Greenland Consulting Engineers Projects

Active & Completed Projects:

Social Media

 
LinkedIn 
YouTube

Client Testimonials

Intact Centre on Climate Adaptation

The Intact Centre on Climate Adaptation (ICCA) is a national applied research centre that focuses on mobilizing practical and cost-effective solutions to address climate change and extreme weather events. To this end, the ICCA is an incubator of new adaptation ideas, conducting research, knowledge mobilization and promoting initiatives aimed at de-risking the negative impacts of a changing climate and extreme weather. One of ICCA’s concerns is a growing uninsurable housing market in Canada relative to sewer backup.
 
ICCA believes the advanced technology and features of the SafeSump system can be instrumental to mitigating basement flood potential.  I have one of the first prototypes of the SafeSump system installed in my home. I have interacted directly with the start-up founder. I view him as entrepreneurial and passionate, and have met other members of his team with whom I was similarly impressed.  I am also familiar with Greenland Consulting Engineers, and congratulate SafeSump Inc. on their choice to create a joint “SafeSump” venture with Greenland.
 
ICCA looks forward to a supportive relationship with SafeSump Inc. upon the larger scale availability of their much-needed technology.

Dr. Blair Feltmate
Head, Intact Centre on Climate Adaptation
Faculty of Environment
University of Waterloo

October 6, 2016
 

Blue Mountain Watershed Trust Foundation

RE: Huntingwood Trail East OLT – Expert Witness Support

On behalf of the Blue Mountain Watershed Trust Foundation (aka ‘Trust’), I would like to extend the Board of Directors’ sincere gratitude to GREENLAND® for its exemplary technical support on the recent Ontario Land Tribunal (OLT) case.

GREENLAND® was retained to develop a defendable, 2-dimensional hydraulic model of the Silver Creek system with many accompanying spills, and in the vicinity of the proposed development. Your firm’s expertise and proficiency with 2-D hydraulic modelling - floodplain management projects were also instrumental in achieving an amicable solution with the developer’s engineering team lead. The solution will now protect residents and property from increased flooding impacts associated with the original subdivision plan (and for only this development phase).

This included your impeccable team to always maintain prompt communication between the OLT parties, and providing staff expertise and support for a concurrent public engagement by the Trust. Your team’s attention to detail and cross-functional collaboration approach was also key to identifying an amicable solution by all parties of the OLT, and as part of an OLT Settlement.

Mark, it was a pleasure to work with GREENLAND® on this file. Thank you also to your team.

Carl Michener
President
Blue Mountain Watershed Trust Foundation

March 29, 2026
 

Town of Penetanguishene

As Director of Public Works for the Town of Penetanguishene, I would like to extend my appreciation to Greeland Consulting Engineers for providing exemplary contract administration and construction inspection services for the Penetang Main Street Reconstruction Project. 

The Main Street reconstruction was a huge undertaking for the Town which consisted of: the full reconstruction of 1.4 km of roadway including widening for improved land widths, on-street parking, storm sewer replacement, watermain and sanitary sewer replacement, as well as landscaping and lighting improvements to better serve businesses and residents. The project included significant logistical challenges with respect to the coordination of public access for businesses, and providing workable upgrades to exisiting infrastructure under difficult site constraints and a tight time line. 

As the Contract Administrator and on-site Construction inspector, Greenland always maintained open lines of communication between the Town, Contractor, affected businesses and residents, and promptly, responded to all questions and issues raised by the Contractor, the Town and the public. Greenland's attention to detail throughout the assignment helped ensure the project was completed on-time and under budget. 

Bryan Murray, P. Eng
Director of Public Works
Town of Penetanguishene

February 12, 2019
 

Corporate Partnerships & Associations

Partnerships and Accreditations